Downhole Well Workover Services

I. Minor Workover (Routine maintenance/repair; most common)

Focuses on running/pulling tubing strings and simple wellbore treatments to restore normal production.

1. Pump inspection/replacement: Inspecting/replacing sucker rod pumps, progressive cavity pumps (PCPs), and electric submersible pumps (ESPs); pulling and running sucker rods and tubing.

2. Sand flushing and well washing: Circulating sand flush to clear sand-buried pay zones or sand-stuck pumps; hot-water washing for wax removal and sludge cleaning.

3. Tubing string operations: Pulling and running tubing, packers, and water distribution tools; water injection well flow adjustment and zonal testing.

4. Water shut-off and channeling control: Locating water-producing zones; squeeze cementing to seal channeling intervals.

5. Simple fishing operations: Retrieving small dropped objects, broken sucker rods, and other simple “fish.”

6. Wellhead maintenance/replacement: Inspection and replacement of Christmas trees, valves, and flanges; wellhead pressure testing.

II. Major Workover (Complex operations; handling downhole accidents and casing damage)

Involves complex processes requiring tools such as mills, swages, and wash-over pipes.

1. Complex fishing and unsticking: Retrieving ESP units, packers, tubing, and cables; unsticking via jarring, back-off, or cutting operations.

2. Casing repair: Casing swaging, patching, and reinforcement; repairing casing leaks/ruptures and casing replacement.

3. Milling, wash-over, and plug drilling: Milling debris, drilling out cement plugs, and section milling casing to clear the wellbore passage.

4. Window-cutting sidetracking: Cutting a window in the existing casing to drill a new lateral wellbore and access remaining oil reserves.

5. Remediation of casing-damaged wells: Treating casing deformation, shear/offset, and rupture.

6. Abandoned well plugging: Permanent zonal isolation via squeeze cementing; wellbore plugging and final well abandonment.

Downhole Process Technology Services

I. Oil Production Process Technology

1. Mechanical zonal production (mechanical zone isolation and water shut-off);

2. Chemical shut-off (chemical sealing of water-producing zones);

3. Mechanical zonal water injection (intelligent zonal injection distribution);

4. Formation unblocking (zonal acidizing, hydraulic abrasive jet perforating, negative-pressure backflow unblocking, hydro-acoustic cavitation jet unblocking, etc.);

5. Fracturing (mechanical zonal fracturing, hydraulic abrasive jet perforating and fracturing, bottom-packer sliding fracturing, etc.).

II. Well Workover Technologies

1. Hydraulic cutting (tubing, casing); capable of internal cutting of stuck tubing and pre-cutting casing during casing replacement.

2. Casing milling; milling and fishing of irregular fish (lost objects) and milling of deformed casing.

3. Mechanically assisted torque-amplified back-off; fishing of downhole tubular strings via torque amplification (converting low input torque into high output torque).

4. Hydraulic lifting/pulling for unsticking; hydraulically assisted fishing of stuck downhole tubular strings (can serve as an alternative to major workovers); the operating force is applied directly at the sticking point, making it particularly suitable for high-deviation wells, horizontal wells, and wells with complex casing trajectories.

5. Casing patching; sealing leaks in casing sections via patching.

Casing swaging/reshaping: mechanically expanding and reshaping deformed casing to restore the internal diameter.

We plan to establish an operations team to provide downhole workover and technical services across the five Central Asian countries. Interested clients are invited to contact us!

Facebook
Twitter
LinkedIn
Pinterest

Leave a Reply

Your email address will not be published. Required fields are marked *

Now Contact Us

Need expert petroleum solutions? Contact us now for reliable equipment and professional support. We're here to help you succeed. Reach out today!

Now Contact Us